The first phase is now complete and we will commence the next phase shortly.
- Manual backups captured to multiple off-site locations before the maintenance run.
- Server wiped and the latest Linux version has been installed and updated.
- WHM suite has been deployed on top and licenses are active.
- All the basic configuration is done and it’s stable.
Next up, we will restore the forum to the server and make the required tweaks for it to run correctly.
Until that is done, only the administration will be able to interact with the board.
Stay tuned for the next update.
